Skip to content

Latest commit

 

History

History
213 lines (157 loc) · 8.63 KB

rfc-004-e2e-framework.rst

File metadata and controls

213 lines (157 loc) · 8.63 KB

RFC 004: E2E Test Framework Enhancements

Changelog

  • 2021-09-14: started initial draft (@tychoish)

Abstract

This document discusses a series of improvements to the e2e test framework that we can consider during the next few releases to help boost confidence in Tendermint releases, and improve developer efficiency.

Background

During the 0.35 release cycle, the E2E tests were a source of great value, helping to identify a number of bugs before release. At the same time, the tests were not consistently passing during this time, thereby reducing their value, and forcing the core development team to allocate time and energy to maintaining and chasing down issues with the e2e tests and the test harness. The experience of this release cycle calls to mind a series of improvements to the test framework, and this document attempts to capture these improvements, along with motivations, and potential for impact.

Projects

Flexible Workload Generation

Presently the e2e suite contains a single workload generation pattern, which exists simply to ensure that the test networks have some work during their runs. However, the shape and volume of the work is very consistent and is very gentle to help ensure test reliability.

We don't need a complex workload generation framework, but being able to have a few different workload shapes available for test networks, both generated and hand-crafted, would be useful.

Workload patterns/configurations might include:

  • transaction targeting patterns (include light nodes, round robin, target individual nodes)
  • variable transaction size over time.
  • transaction broadcast option (synchronously, checked, fire-and-forget, mixed).
  • number of transactions to submit.
  • non-transaction workloads: (evidence submission, query, event subscription.)

Configurable Generator

The nightly e2e suite is defined by the testnet generator, and it's difficult to add dimensions or change the focus of the test suite in any way without modifying the implementation of the generator. If the generator were more configurable, potentially via a file rather than in the Go implementation, we could modify the focus of the test suite on the fly.

Features that we might want to configure:

  • number of test networks to generate of various topologies, to improve coverage of different configurations.
  • test application configurations (to modify the latency of ABCI calls, etc.)
  • size of test networks.
  • workload shape and behavior.
  • initial sync and catch-up configurations.

The workload generator currently provides runtime options for limiting the generator to specific types of P2P stacks, and for generating multiple groups of test cases to support parallelism. The goal is to extend this pattern and avoid hardcoding the matrix of test cases in the generator code. Once the testnet configuration generation behavior is configurable at runtime, developers may be able to use the e2e framework to validate changes before landing changes that break e2e tests a day later.

In addition to the autogenerated suite, it might make sense to maintain a small collection of hand-crafted cases that exercise configurations of concern, to run as part of the nightly (or less frequent) loop.

Implementation Plan Structure

As a development team, we should determine the features should impact the e2e testing early in the development cycle, and if we intend to modify the e2e tests to exercise a feature, we should identify this early and begin the integration process as early as possible.

To facilitate this, we should adopt a practice whereby we exercise specific features that are currently under development more rigorously in the e2e suite, and then as development stabilizes we can reduce the number or weight of these features in the suite.

As of 0.35 there are essentially two end to end tests: the suite of 64 generated test networks, and the hand crafted ci.toml test case. The generated test cases help provide systemtic coverage, while the ci run provides coverage for a large number of features.

Reduce Cycle Time

One of the barriers to leveraging the e2e framework, and one of the challenges in debugging failures, is the cycle time of running a single test iteration is quite high: 5 minutes to build the docker image, plus the time to run the test or tests.

There are a number of improvements and enhancements that can reduce the cycle time in practice:

  • reduce the amount of time required to build the docker image used in these tests. Without the dependency on CGo, the tendermint binaries could be (cross) compiled outside of the docker container and then injected into them, which would take better advantage of docker's native caching, although, without the dependency on CGo there would be no hard requirement for the e2e tests to use docker.
  • support test parallelism. Because of the way the testnets are orchestrated a single system can really only run one network at a time. For executions (local or remote) with more resources, there's no reason to run a few networks in parallel to reduce the feedback time.
  • prune testnet configurations that are unlikely to provide good signal, to shorten the time to feedback.
  • apply some kind of tiered approach to test execution, to improve the legibility of the test result. For example order tests by the dependency of their features, or run test networks without perturbations before running that configuration with perturbations, to be able to isolate the impact of specific features.
  • orchestrate the test harness directly from go test rather than via a special harness and shell scripts so e2e tests may more naively fit into developers existing workflows.

Many of these improvements, particularly, reducing the build time will also reduce the time to get feedback during automated builds.

Deeper Insights

When a test network fails, it's incredibly difficult to understand _why_ the network failed, as the current system provides very little insight into the system outside of the process logs. When a test network stalls or fails developers should be able to quickly and easily get a sense of the state of the network and all nodes.

Improvements in persuit of this goal, include functionality that would help node operators in production environments by improving the quality and utility of the logging messages and other reported metrics, but also provide some tools to collect and aggregate this data for developers in the context of test networks.

  • Interleave messages from all nodes in the network to be able to correlate events during the test run.
  • Collect structured metrics of the system operation (CPU/MEM/IO) during the test run, as well as from each tendermint/application process.
  • Build (simple) tools to be able to render and summarize the data collected during the test run to answer basic questions about test outcome.

Flexible Assertions

Currently, all assertions run for every test network, which makes the assertions pretty bland, and the framework primarily useful as a smoke-test framework, but it might be useful to be able to write and run different tests for different configurations. This could allow us to test outside of the happy-path.

In general our existing assertions occupy a fraction of the total test time, so the relative cost of adding a few extra test assertions would be of limited cost, and could help build confidence.

Additional Kinds of Testing

The existing e2e suite, exercises networks of nodes that have homogeneous tendermint version, stable configuration, that are expected to make progress. There are many other possible test configurations that may be interesting to engage with. These could include dimensions, such as:

  • Multi-version testing to exercise our compatibility guarantees for networks that might have different tendermint versions.
  • As a flavor or mult-version testing, include upgrade testing, to build confidence in migration code and procedures.
  • Additional test applications, particularly practical-type applciations including some that use gaiad and/or the cosmos-sdk. Test-only applications that simulate other kinds of applications (e.g. variable application operation latency.)
  • Tests of "non-viable" configurations that ensure that forbidden combinations lead to halts.

References