Skip to content

full path

full path #110

Triggered via push April 20, 2024 13:41
Status Failure
Total duration 1m 11s
Artifacts

main.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.9)
Process completed with exit code 1.
test (3.9)
Process completed with exit code 2.
test (3.8)
The job was canceled because "_3_9" failed.
test (3.8)
Process completed with exit code 2.
test (3.8)
The operation was canceled.
test (3.10)
The job was canceled because "_3_9" failed.
test (3.10)
The operation was canceled.
test (3.10)
Process completed with exit code 2.