chore: update lint packages (major) #16085
Triggered via pull request
October 24, 2024 23:29
Status
Failure
Total duration
6h 45m 58s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
6h 0m
Code Lint
6m 6s
Commit Lint
6m 2s
Verify Docs
6m 13s
Post-Test
0s
Annotations
6 errors
Test (windows-latest, 20)
Process completed with exit code 1.
|
Code Lint
Process completed with exit code 2.
|
Test (macos-latest, 20)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|
Test Benchmark
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
|
Test Benchmark
The operation was canceled.
|