Expand Up @@ -52,11 +52,11 @@ around 25% of resources from a Zynq-7020.
## 4. Bring-up and Testing

Standard electrical checks for hardware bring-up should be followed (e.g. visual
inspection, ohm-meter tests, voltage levels, etc.) before inserting the IPMC onto
an actual carrier.
inspection, ohm-meter tests, voltage levels, etc.) before inserting the IPMC on a
carrier.

The [ZYNQ-IPMC Test Board](TestBoard) can be used for these tests and a few more,
such as GPIO short/floating detection. As long as electrical checks are fine there should
The [ZYNQ-IPMC Test Board](TestBoard) can be used for these tests and additional
connectivity tests.

## 5. Fabrication and Assembly

Expand Down