chore: add Solana shared utilities and constants #47555
main.yml
on: pull_request
Matrix: Run tests / Unit tests
Check workflows
7s
Run tests
/
Webpack tests
2m 9s
Run tests
/
Integration tests
2m 44s
All jobs pass
0s
Annotations
13 errors
Run tests / Integration tests
Process completed with exit code 1.
|
Run tests / Unit tests (6)
Process completed with exit code 1.
|
Run tests / Unit tests (2)
The job was canceled because "_6" failed.
|
Run tests / Unit tests (2)
The operation was canceled.
|
Run tests / Unit tests (4)
The job was canceled because "_6" failed.
|
Run tests / Unit tests (4)
The operation was canceled.
|
Run tests / Unit tests (5)
The job was canceled because "_6" failed.
|
Run tests / Unit tests (5)
The operation was canceled.
|
Run tests / Unit tests (1)
The job was canceled because "_6" failed.
|
Run tests / Unit tests (1)
The operation was canceled.
|
Run tests / Unit tests (3)
The job was canceled because "_6" failed.
|
Run tests / Unit tests (3)
The operation was canceled.
|
All jobs pass
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage-webpack
|
19 KB |
|